Home  /  Services  /  Plastering

CHAPTER 07 — PLASTERBOARD INSTALLATION & PLASTERING

The wall behind the tile
and under the paint.

I install plasterboard and do plastering as practical finishing work. It usually goes hand in hand with tiling and room renovations in Bentleigh and the surrounding Melbourne suburbs. This is surface work: it gets walls sound, flat and ready for what goes on them next.

A worker holds a broad metal joint knife loaded with white filler or plaster while using a smaller trowel on an interior surface.

WHEN PLASTERING COMES UP

A practical checklist

— Old tiles have come off and the wall underneath is damaged, patchy or uneven.

— A section of plasterboard needs replacing before new tiles or paint go on.

— Cracks, holes or old fixings are left in walls after a room has changed.

— New wall areas next to a renovated bathroom, kitchen or laundry need lining and finishing.

— Walls need to be flat and properly finished so paint sits evenly.

If one of these sounds like your home, I’ll look at it during the free on-site assessment.

01

Repairs after tile removal

Taking tiles off a wall rarely leaves a clean surface. I repair or replace the damaged areas so the next finish isn’t sitting on a weak base.

02

Plasterboard installation

I fix new plasterboard sheets where walls need lining or a damaged section has to be cut out. Joints are set and sanded ready for finishing.

03

Preparing for paint

Patching, filling and sanding so the wall is ready for interior painting. Paint shows every flaw underneath, so this step counts.

LAYER BELOW THE FINISH

Why the order of work matters

When one person handles the tiling, the plastering and the painting, the wall is prepared for whatever finish goes on that part of it. Where tiles stop and paint starts, both surfaces are planned together, so you don’t end up with a patched wall meeting a new tile edge.

This is the same idea behind my approach to surface preparation: a more expensive product cannot make up for an unsuitable or poorly prepared surface.

White wall tiles are being installed in rows on a partially unfinished wall, with a tape measure stretched across the surface for layout guidance.

04

EXISTING CONDITIONS

What the wall shows once it's opened up

Concealed conditions may only become apparent after existing finishes are removed. If I find something behind old tiles or plaster that changes the work, I’ll explain it to you and talk through the options before going further.

Costs, timeframes and work requirements depend on the existing property, the selected materials and the agreed scope. Any pricing discussed is general guidance until it’s set out in a detailed written quotation.

Any plumbing or electrical work inside a wall is completed by appropriately licensed specialists.