Home / Services / Bathrooms

CHAPTER 01

01 — The finished tile

02 — Setting out

03 — Surface preparation

04 — Removal & existing conditions

BATHROOM TILING & RENOVATIONS · BENTLEIGH

A bathroom is tiled
from the bottom up.

I tile bathroom walls and floors and carry out bathroom renovation work in Bentleigh and the surrounding Melbourne suburbs. Before I recommend any tile or material, I look at what it will sit on. You deal directly with me from the on-site assessment through to completion.

THE APPROACH

What you see is the last layer.

Most people judge a bathroom by its tiles: the colour, the format, the grout lines. That matters. But in my experience, proper preparation matters as much as the visible finish. A more expensive tile can’t make up for a surface that is unsuitable or poorly prepared.

That’s why each bathroom starts with a free on-site assessment. I check the walls and floor as they are now, talk through what you’d like to achieve, and explain the practical options, including any limitations I can see from the start.

The bands below follow a bathroom tiling job in reverse, reading down from the finished surface to the existing conditions underneath. More detail is in my guide to surface preparation.

01

LAYER 01 — THE FINISHED TILE

Wall and floor tiling

This is the part you live with: bathroom wall tiles, floor tiles, the junctions around the shower and vanity, and even, consistent grout lines. I set each tile against the layout we agreed and check the alignment as the work goes. If you are still choosing materials, my notes on choosing suitable tiles for bathrooms are a useful place to start.

02

LAYER 02 — SETTING OUT

Planning where every cut lands

Before the first tile goes on, I work out the layout. I decide where full tiles start, where the cuts fall and how the lines meet at doorways, niches and fixtures. Small cuts and uneven joints are much easier to avoid on paper than to correct on the wall.

A worker’s hand positions a white wall tile against a partially tiled interior wall, with tile lines, adhesive and protective sheeting visible.

Illustrative stock photograph: wall tiles going on in rows along a set-out line.

03

LAYER 03 — SURFACE PREPARATION

A sound, flat base

I check the walls and floor for flatness, soundness and suitability for the tile you have chosen, then repair, level or prime them as needed. This stage rarely shows in photographs, but it largely decides how the finished surface holds up.

04

LAYER 04 — REMOVAL & EXISTING CONDITIONS

What the old tiles were hiding

Removing the old tiles and finishes shows what the bathroom is really built on. Some concealed conditions only become apparent once the existing tiles come off. If anything changes the work, I’ll explain it and discuss the options with you before going further.

For that reason, the cost, timeframe and work requirements of each bathroom depend on the existing property, the materials you select and the scope we agree. Read more in What Can Be Hidden Behind Old Tiles.

A worker wearing protective clothing and gloves cuts a large paving or tile slab with an angle grinder, producing visible dust in an outdoor work area.

Illustrative stock photograph: cutting a tile slab with an angle grinder, the kind of dusty work that comes before any new finish.

A bright modern bathroom with a freestanding white bathtub, wall-mounted basin, large mirror, towels and a green potted plant.

Reference photograph of a finished bathroom.

SCOPE & QUOTATION

How a bathroom
is quoted

After the on-site assessment, I prepare a detailed written quotation that sets out the work I’ve agreed to carry out. Any pricing I give before then is general guidance only.

In a bathroom renovation, appropriately licensed specialists complete the plumbing and electrical components. I plan the tiling and preparation around their work so the stages follow in a sensible order.

Urgent or weekend work may sometimes be possible, depending on availability. You can see how each step works on the assessment and quotation process page and in the quotation and work terms.

Planning a bathroom?
Start with what's there now.

Tell me your suburb and what you’d like done, and add photos of the current bathroom if you have them. I’ll arrange a time to look at the existing conditions in person. How to prepare for an on-site assessment covers what’s worth noting beforehand.